Operational Issues: The client needed a high-performance floor system suitable for a professional environment with medium foot traffic. The floor had previously been tiled, and the subfloor was self-leveled by the contractor before our arrival.
Specific Metrics: The flooring had to be completed within 3 days to meet the client’s renovation schedule.
Budget Constraints: The client required a premium, durable finish without exceeding the renovation budget.
Selected Services: Art Epoxy Designs installed a two-tone metallic epoxy floor, blending Dolphin and Sterling Grey pigments for a sleek, modern finish.
Process Breakdown:
Operational Efficiency: The project was completed in 3 days as scheduled, allowing other trades to resume work without delay.
Customer Satisfaction: Saul and his client were thrilled with the final results—both the aesthetics and the durability met their expectations.Client Testimonial
“Art Epoxy Designs delivered a clean, polished floor that perfectly matches the professional vibe we needed. Quick, clean, and top-quality work.” – Contractor Saul
This office transformation in Oakland Park underscores Art Epoxy Designs’ versatility and reliability when working with commercial contractors. The metallic epoxy system delivered a modern, professional finish that’s built to last.
Ready to upgrade your commercial space with stunning epoxy floors? Contact Art Epoxy Designs today and let’s bring your vision to life!